• assessment-icon
  • Assessment

  • We evaluate the chosen site to account for and mitigate any potential hazards or complications that could occur during construction after careful review of the drawings and specifications prepared by a geotechnical engineer.
  • preconstruction-icon
  • Pre-Construction

  • Preparation is the key to a successful project and we conduct pre-construction meeting and tasks to kick off the project right.
    • Meet with stakeholders
    • Finalize building schedule
    • Address any potential issues that may impede construction
  • estimation-icon
  • Estimation/Quotation

  • Com-Con will analyze and estimate the needs of the project to ensure that construction runs smoothly and every aspect of construction is accounted for.
    • Calculation based on drawings and specifications
    • Material estimates
    • Equipment and labour requirements
  • installation-iocn
  • Installation

  • It’s essential that the construction of MSE or modular block retaining walls must be executed correctly. Com-Con has an established procedure for our projects that all employees must follow.
    • Follow design specifications
    • Adhere to established Com-Con installation procedures
    • Soil compaction, placement of geotextile material, setting of blocks or panels, backfilling—all tasks to complete the project are supervised carefully and compliance with all applicable procedures is ensured.